• Project added truck and rail unloading and loadout capability, in conjunction with (3) 550,000 bushel capacity jump form concrete bins.

• 25,000 BPH truck receiving pit and 50,000 BPH rail shuttle receiving pit.

• Machinery catwalks allow access to bins and 25,000 BPH transfer conveyors from tower.

• Each hopper bottom bin utilizes a 50,000 BPH side draw spout for primary bin unloading, and then a 7,500 BPH auger with telescoping head section for final bin cleanout.

Request a Quote
Sending