• This project added 50,000 BPH shuttle train unloading and loadout capability, along with a 500,000 bushel capacity jump form concrete grain bin.

• On this project, HABCO, Inc. fabricated all spouting, platforms, diverters, stairs, etc.

Features on the project include:

• 50,000 BPH gravity dump pit with 24′ long dump grate to receive product from rail cars and from trucks.

• 50,000 BPH leg discharges to the new jump form grain bin and to the existing slip form annex.

• 50,000 bph discharge on the new jump form bin to the new leg.

• 50,000 BPH belt conveyor below the existing slip form annex to the new leg.

• 50,000 BPH bulkweigher, sampler and hydraulic loadout spout.