• Several upgrades to this facility have been completed in the last ten years. We have added storage – both temporary and permanent – on four separate occasions. The first project also included an upgrade for high speed unit train loading capabilities.

• The initial facility upgrade included two new jump form concrete tanks.

• A new truck receiving pit and high speed rail loadout capabilities were also added at this time.

• This project included new upper and lower handling equipment throughout. The system is fully automated using Kasa controls and has a very high degree of flexibility.

• The rail loadout system utilizes Intersystems bulkweighing and sampling equipment in conjunction with HABCO fabricated spouting and our exclusive hydraulic rail loadout spout.

• Approximately 2.5 million bushels of temporary storage was added in 2002. All of this space was later upgraded to permanent storage with the addition of eight 105’ GSI steel bins.

• The latest project included a third truck receiving driveway and pit.